SST’s T&E process systematically examines and validates the performance, reliability, and safety of various systems, products, and technologies to ensure they meet specified requirements and perform as intended. SST has extensive T&E experience and performs a full range of T&E activities that provides expert resources and services to our customers. Our T&E experience spans virtually all areas of systems and software testing, including:
Our test engineers review and evaluate on existing system/software requirements and participate in Preliminary Design Reviews thus facilitating the removal of requirement gaps prior to development resulting in substantial development cost saving and a faster time to market/deployment. We also conduct or participate in pre-transition site inspections and develop site inspection reports which thwart installation and deployment issues that may cause delays in the eventual delivery of developed systems. Additionally, when new systems are to be integrated with or into legacy systems, we provide analysis and evaluation services that produces a set of system functional and operational changes that would be required of either system in order to produce a single cohesive system.
We provide support for our customer’s DT activities and requirements for both software and hardware systems and subsystems. We conduct and participate in Test Working Groups to ensure that pertinent test issues are discussed with and resolved by the appropriate contributing contractor or vendor. We use progressive and measured approaches to address T&E standards and to verify requirements starting with basic component levels, and incrementally building and evaluating requirements for complex, integrated components, and systems during DT. Our test engineers develop and execute DT plans and procedures formulated to maximize system test coverage.
SST supports DT integration testing in laboratory environments to verify that systems are complete, and that external systems and interfaces are functioning properly. We develop test tools that emulate the projected operational conditions, and we run DT system testing using these custom-built test tools to verify the integrity of integrated software and hardware components at the system level.
SST performs OT support to validate that new or modified systems are operationally effective, safe, and suitable for use. We develop OT test plans, procedures, and scenarios, and conduct dry runs of OT test procedures.
We support OT pre-test briefings that include:
Our engineers execute OT test procedures, conduct post-test reviews to review test results, and debrief testers and observers to identify any undocumented issues. We perform data analysis to determine system accuracy, completeness, and correctness. We generate OT discrepancy reports for all issues discovered during OT. We use the contents of the OT post-test reviews and test status reports to generate final test reports.
SST supports Key Site Test activities and tasks. We provide technical assistance as required to site personnel during site transition activities (e.g. communication, installation, checkout, evaluation), and conduct Key Site testing and the development and publishing of test results. Tests supported include Factory Acceptance Tests (FAT), throughput timing and stability tests, Production Acceptance Tests (PAT); Site Acceptance Tests; Site Interface Tests; System Evaluation Tests; OT; regression tests; system reliability and maintainability tests; and system shakedown tests.